Client: Ndwedwe Local Municipality
Completed: (date)

This eight-month long project entailed the construction of 5.3 km of access gravel road in Ward 4 in Chibini. The scope of works included:

  • Six-metre-wide gravel riding surface
  • Storm water drainage
  • 6-metre-wide concrete side-drains (where necessary)
  • 450mm to 900mm diameter pipe culverts (as dictated by terrain and water catchment area)
  • Stone pitching
  • Road signage