Client: Ndwedwe Local Municipality
Completed: (date)
This eight-month long project entailed the construction of 5.3 km of access gravel road in Ward 4 in Chibini. The scope of works included:
- Six-metre-wide gravel riding surface
- Storm water drainage
- 6-metre-wide concrete side-drains (where necessary)
- 450mm to 900mm diameter pipe culverts (as dictated by terrain and water catchment area)
- Stone pitching
- Road signage